MEVA FormSet anchors for single-sided formwork, stop end rail and stop end bracket for slab edges and cantilevering slabs with safety mesh for slab edge fall protection
moreWorker protection when assembling MevaDec slab formwork from above.
moreMEVA props EuMax for slab formwork covering the entire range form 250 to 550 cm. The series' advantage: safety and high quality.
moreMEVA shoring tower MEP - the modular system for safety and heavy loads at heights up to 21 m. Functions as premium safety working platform.
moreSafety Built-in from A to Z. MT 60 is compatible with the MevaDec slab formwork system.
more3 methods in one Slab formwork system: 1) drop-head beam panel method with early stripping. 2) Panel method with panels only. 3) Primary and secondary beam method for separate facing for compensation areas.
moreConventional slab formwork with H20 beam, prop and fork prop head, separate forming face. Easy adaptation to varying slab layouts.
more